Projects

LSY excels at delivering sustainable, innovative engineering solutions for all types of projects. We utilise our creativity and expertise to provide a range of services for New Builds, Refurbishments and Temporary Works. Our clear communication and transparency ensure that every result we provide will be the right fit for the client.

Our Projects

  • Type of project

  • Service

Balfour Place, London, UK

LSY Engineering Consultants was appointed to provide temporary works design services for the structural refurbishment of a six-storey listed property with basement accommodation in Mayfair, London. The project involved the removal of several loadbearing structural walls at basement level and the formation of new openings through existing vault structures as part of the wider redevelopment works. LSY's commission was to develop temporary works solutions that would safely support the existing structure during the demolition and alteration phases.

Brighton Dome, Brighton, UK

LSY Engineering Consultants was appointed by the groundworks contractor to provide temporary works design services for the structural upgrade of the Grade I Listed Brighton Dome, one of the UK's most significant cultural and performing arts venues. Located within the prestigious Royal Pavilion Estate in the centre of Brighton, the Regency-era building required the construction of a new basement area beneath the auditorium to create a level floor arrangement that would enhance the venue's functionality and accessibility. Our scope included the design of underpinning works, temporary excavation support systems, sheet piling arrangements, and associated temporary works required to facilitate the basement formation safely within the existing historic structure.

Brompton Road, London, UK

LSY Engineering Consultants Ltd was appointed to provide full structural engineering and Building Control design services for the refurbishment of a property in Brompton Road, a four-storey mixed-use building located within the Royal Borough of Kensington and Chelsea. The project involved a comprehensive programme of structural alterations and upgrades, including the assessment and strengthening of existing structural elements, the design of new steelwork, floor strengthening works, chimney support arrangements, lintel designs for new openings, and the integration of new composite floor construction. Our involvement covered RIBA Stages 4 and 5, from detailed structural assessment through to construction support and Building Control approval.

Dunkeld, Scotland, UK

LSY Engineering Consultants Ltd was appointed as Temporary Works Engineer and Contractor's Engineering Manager (CEM) Coordinator for the upgrade and installation of an Intermediate Pressure (IP) Gas Pipeline adjacent to an operational Network Rail tunnel in Scotland. The works formed part of a critical infrastructure upgrade located along one of Scotland's principal rail corridors between Edinburgh and Inverness. Due to the operational requirements of the railway network, construction activities could only be undertaken during restricted overnight possession periods between 23:00 and 05:00. Our role included the design of temporary protective barrier systems to safeguard the railway infrastructure during the works, coordination of engineering approvals, and management of the temporary works process in accordance with Network Rail requirements.

Embassy Facility Refurbishment, London, UK

LSY Engineering Consultants Ltd was appointed as Lead Temporary Works Engineer for the refurbishment of an existing embassy building in London. The project involved extensive internal alterations, the removal of structural elements, the installation of new service routes, and below-ground excavation work within a constrained urban site. Our role included the design and coordination of all temporary works required to facilitate the refurbishment safely and efficiently while maintaining the stability of the existing structure throughout the construction process.

Grade I Listed Residence, London, UK

LSY Engineering Consultants Ltd was appointed as lead Temporary Works Engineers for the refurbishment and extension of an existing 4no.storey Grade I listed building in Central London. The project comprised an extensive programme of refurbishment works, including a basement extension, new swimming pool installation, roof extension, and significant structural alterations throughout the existing building. Given the scale and complexity of the development, temporary works played a critical role in ensuring the stability of both the building and neighbouring properties throughout construction. Our appointment included the design, coordination, and inspection of numerous temporary works elements, including: Basement wall propping Hoarding design Masonry façade retention systems Needling arrangements Scaffold support designs Shaft excavation support structures Swimming pool support arrangements Temporary propping systems Underpinning support systems

Hugh Street, London, UK

We were contracted by a central London property fund to refurbish an existing hotel by joining together three properties and removing several internal structural walls.