Our Latest Temporary Works Projects

Charing Cross Station, London, UK

LSY Engineering Consultants Ltd was appointed to provide temporary works design and structural engineering support as part of a £20 million programme of upgrades to the 175-year-old Hungerford Bridge at Charing Cross Station. The project involved the replacement of approximately 2km of country-end platforms with new Glass Reinforced Polymer (GRP) platforms supported on a new framing system incorporating elements of the existing structure. To facilitate the platform replacement works, two self-erecting tower cranes were required to undertake the dismantling and installation operations during a major engineering blockade. LSY's involvement focused on the construction phase, where we developed temporary works solutions to support the contractor's methodology and sequence of works. Our scope included the design of crane base foundations, assessment of structural risks, BIM coordination, and the development of temporary works solutions to protect surrounding infrastructure throughout the construction process.

Embassy Facility Refurbishment, London, UK

LSY Engineering Consultants Ltd was appointed as Lead Temporary Works Engineer for the refurbishment of an existing embassy building in London. The project involved extensive internal alterations, the removal of structural elements, the installation of new service routes, and below-ground excavation work within a constrained urban site. Our role included the design and coordination of all temporary works required to facilitate the refurbishment safely and efficiently while maintaining the stability of the existing structure throughout the construction process. Challenges The project presented several significant engineering challenges, largely due to the age and nature of the existing building. The embassy's external masonry walls were approximately 1m thick and supported substantial structural loads. As a result, temporary works associated with excavation support and manhole construction had to be designed to accommodate significant surcharge loads from the adjacent structure. A further challenge was the lack of accurate information regarding the existing internal structure. Much of the building fabric remained concealed during the initial survey phase, making it difficult to determine load paths, wall construction, and structural arrangements before intrusive investigations were undertaken. The site was also heavily constrained, limiting access for plant, equipment, and construction materials and requiring careful consideration of the temporary works methodology. Process LSY coordinated an initial programme of trial holes and intrusive investigations to establish the existing structural arrangement and determine the depth and configuration of the existing foundations. The investigations confirmed that the proposed excavation works would be undertaken in close proximity to the existing building foundations and that the temporary works system would need to accommodate significant building surcharge loads while maintaining excavation stability. Due to the restricted site access, we developed a temporary works solution using timber waling beams and sheeted excavation support systems. The lightweight nature of the materials allowed them to be transported and installed within the confined site environment while maintaining the required structural performance. For the internal alterations, several load-bearing walls were scheduled for removal as part of the refurbishment works. LSY designed a temporary support system comprising multi-props and steel needle beams, propped from the existing floor slab at three key locations. This arrangement provided a safe and efficient means of maintaining structural stability while permanent alterations were undertaken. The project also involved the removal of an existing steel beam weighing approximately six tonnes. Following consultation with the contractor, it was agreed that the beam would be dismantled in 1m sections to overcome site access restrictions and minimise lifting requirements. Detailed structural checks were undertaken to confirm that the remaining supporting structure could safely resist the temporary point loads generated during the phased removal process. This allowed the work to proceed safely without the need for additional extensive temporary support systems. Throughout the project, LSY worked closely with the contractor and wider design team, ensuring that temporary works designs were practical, buildable, and fully integrated with the construction programme. Outcome The excavation and refurbishment works were completed successfully and ahead of programme. The use of lightweight timber excavation support elements enabled the contractor to overcome challenging site access restrictions while maintaining safe working conditions throughout the construction phase. Similarly, the temporary needle beam and multi-prop support arrangements provided an efficient solution for the internal alterations, helping to reduce programme durations and minimise disruption to the wider project. The successful delivery of the scheme demonstrated the value of early temporary works involvement and close collaboration between the engineering and construction teams. As a result of the project's success, LSY Engineering Consultants Ltd was subsequently appointed by the main contractor on a number of additional projects to provide temporary works engineering services.

Tite Street, London, UK

LSY Engineering Consultants Ltd was appointed by specialist structural contractor to provide temporary works design services for the structural refurbishment of a residential property in Chelsea, London. Our scope involved the design of temporary works required to facilitate the removal of several loadbearing structural walls, the formation of new openings in accordance with the proposed architectural layout, temporary support for roof removal works, and specialist structural support arrangements for an existing masonry arch.

As proud members of the Temporary Works Forum, LSY provides specialist temporary works design and independent Category 2 and Category 3 design checks for projects across the UK and beyond. Our experience spans aviation, commercial, education, hotels, infrastructure, leisure, listed buildings, nuclear, rail, residential and retail. From developing practical temporary support schemes to complex and safety-critical designs, our experienced engineers work closely with contractors and project teams to develop efficient and buildable solutions.

Our temporary works expertise includes temporary propping, needling systems, façade and structural retention, excavation support, sheet piling, piling platforms, crane bases and crane pad certification, scaffold support, hoarding, formwork, shoring, temporary foundations and other bespoke temporary structures. LSY has delivered solutions for complex refurbishments, major basement construction, prestigious residential developments, five-star hotels and sensitive historic and listed buildings, including projects such as Brighton Dome, Wentworth Estate and major developments across London and the UK.

With both permanent and temporary works expertise in-house, LSY can support projects from early structural assessment and design through to construction, site inspections and certification. Our hands-on approach, clear communication and focus on buildability allow us to respond quickly to changing site conditions while helping our clients manage risk, programme and cost.

Our temporary works design solutions include:

  • Access platforms
  • Back propping
  • Canti decking
  • Crane bases
  • Crane Pad Certification
  • Excavation batter designs
  • Excavation shaft supports
  • Hoarding design




  • Façade retention
  • Formwork Design
  • Hoarding Design
  • Needling beam systems
  • Piling platforms
  • Protective barrier systems
  • Scaffold base design
  • Sheet piling
  • Shoring
  • Structural appraisal checks
  • Temporary cabin foundations
  • Temporary propping
  • Temporary roof support
  • Thrust blocks
  • Underpinning

To speak to a member of the team please get in touch here

CPD training

LSY Engineering Consultants Ltd also offers CPD training in temporary works for covering topics like design briefs, category 2 checks, category 3 checks with both theoretical and practical training. To book a session, use the link below. link to book.