Surveys

A survey should give you a clear picture of a property or location so you can make well-informed choices ahead of any transaction. We offer a range of comprehensive surveys for private investors, property funds, insurance companies and housing associations, including:

  • Condition Surveys
  • Geotechnical investigation scopes
  • Tell-tale crack monitoring
  • Structural surveys
  • Subsidence surveys
  • Acoustic Surveys
  • Carpark Life-Cycle Care Plan

Ahead of a survey, we conduct a desk study phase to gather information, using our in-house template report to create an initial assessment of the property.

This stage is essential in ensuring an efficient, correct and client-focused report which identifies issues as early as possible.

Our experienced structural engineers then perform the survey and afterwards, all reports, documentation and photos are thoroughly reviewed.

The final report is signed off by a minimum of two chartered civil or structural engineers to ensure peace of mind and the highest standards of quality for our clients.

Speak to us about your project by clicking here.

We also undertake CPD training for housing associations and building surveyors on structural surveys and defect identification. The experienced engineers at LSY provide training on topics like subsidence, settlement, structural movement and roof spread.

See how we can help with your Survey Project

Our Survey Projects

Balfour Place, London, UK

LSY Engineering Consultants was appointed to provide temporary works design services for the structural refurbishment of a six-storey listed property with basement accommodation in Mayfair, London. The project involved the removal of several loadbearing structural walls at basement level and the formation of new openings through existing vault structures as part of the wider redevelopment works. LSY's commission was to develop temporary works solutions that would safely support the existing structure during the demolition and alteration phases. Our scope included the design of needling and propping systems to facilitate the removal of basement walls, together with roof support and back-propping arrangements to maintain structural stability throughout the top-down demolition sequence. Challenges The project presented several significant engineering challenges. The property was a listed building located within a sensitive Central London environment, where historic bomb damage from the Second World War had the potential to affect existing ground conditions and foundation arrangements. As a result, excavation works required careful planning and execution to minimise risk. In addition, the existing foundation details at basement level were unknown. This uncertainty necessitated a programme of trial hole investigations to establish the form and condition of the foundations before both temporary and permanent works designs could be finalised. The constrained nature of the site, combined with the requirement to maintain structural stability throughout the demolition process, demanded a highly coordinated temporary works strategy.

Oxford Street, London, UK

LSY Engineering Consultants Ltd was appointed as the Tenant's Structural Engineer for the proposed fit-out of a retail unit in Oxford Circus, London, UK. The prospective tenant required additional storage space and staff facilities within the rear of the unit and proposed the construction of a new mezzanine floor within the existing building. LSY's role was to develop and design a lightweight mezzanine solution that minimised the impact on the existing structure while providing the additional floor area required by the tenant. Our services included the structural design of the new mezzanine floor, coordination with the landlord's engineer, and the development of bespoke strengthening solutions where required.

Tottenham Court Road, London, UK

LSY Engineering Consultants Ltd were appointed as lead structural engineers on a Central London project refurbishment scheme. The client was ‘Optical Center’ who required the removal of structural slabs and walls to accommodate the new layouts proposed by the architect. For this project, LSY was involved from the initial feasibility stage to the final handover.