Surveys

A survey should give you a clear picture of a property or location so you can make well-informed choices ahead of any transaction. We offer a range of comprehensive surveys for private investors, property funds, insurance companies and housing associations, including:

  • Condition Surveys
  • Geotechnical investigation scopes
  • Tell-tale crack monitoring
  • Structural surveys
  • Subsidence surveys
  • Acoustic Surveys
  • Carpark Life-Cycle Care Plan

Ahead of a survey, we conduct a desk study phase to gather information, using our in-house template report to create an initial assessment of the property.

This stage is essential in ensuring an efficient, correct and client-focused report which identifies issues as early as possible.

Our experienced structural engineers then perform the survey and afterwards, all reports, documentation and photos are thoroughly reviewed.

The final report is signed off by a minimum of two chartered civil or structural engineers to ensure peace of mind and the highest standards of quality for our clients.

Speak to us about your project by clicking here.

We also undertake CPD training for housing associations and building surveyors on structural surveys and defect identification. The experienced engineers at LSY provide training on topics like subsidence, settlement, structural movement and roof spread.

See how we can help with your Survey Project

Our Survey Projects

The Cottage, Finsbury Park, London, UK

LSY Engineering Consultants Ltd was appointed by a Berlin-based architect as Lead Structural Engineer for the design and construction of a new annex to a residential property situated on a prominent historic corner plot in North London. The project involved the creation of approximately 80m² of additional accommodation, incorporating a green roof and a design sympathetic to the character of the surrounding area. Our appointment covered RIBA Stages 3 to 5, from concept development and tender through to detailed design, construction support, and site monitoring. Working closely with the architect and contractor, LSY provided a fully integrated structural engineering service to deliver a practical and buildable solution that responded to both the site's constraints and the client's aspirations. Challenges The project was undertaken under a fast-track programme, requiring site investigations, detailed design, and construction activities to progress concurrently. The site was heavily constrained by neighbouring structures and infrastructure. One boundary adjoined an existing property with a basement, while another bordered a public highway. As a result, careful consideration was required when developing the foundation solution to ensure the stability of adjacent structures was maintained throughout construction. As demolition and opening-up works progressed, further information regarding the existing ground conditions and neighbouring foundations became available. This revealed that the original trench-fill foundation and ground-floor slab proposals required modification to accommodate a new retaining wall along the boundary and address the constraints imposed by the adjacent basement structure. Key engineering challenges included: Assessing ground conditions and adapting the foundation design to suit constrained site conditions. Developing and detailing a revised retaining wall and foundation solution within a compressed programme. Establishing an appropriate construction sequence to maintain the stability of neighbouring properties and the adjacent highway. Managing design changes arising from ongoing site investigations without delaying construction progress.

Embassy Facility Refurbishment, London, UK

LSY Engineering Consultants Ltd was appointed as Lead Temporary Works Engineer for the refurbishment of an existing embassy building in London. The project involved extensive internal alterations, the removal of structural elements, the installation of new service routes, and below-ground excavation work within a constrained urban site. Our role included the design and coordination of all temporary works required to facilitate the refurbishment safely and efficiently while maintaining the stability of the existing structure throughout the construction process. Challenges The project presented several significant engineering challenges, largely due to the age and nature of the existing building. The embassy's external masonry walls were approximately 1m thick and supported substantial structural loads. As a result, temporary works associated with excavation support and manhole construction had to be designed to accommodate significant surcharge loads from the adjacent structure. A further challenge was the lack of accurate information regarding the existing internal structure. Much of the building fabric remained concealed during the initial survey phase, making it difficult to determine load paths, wall construction, and structural arrangements before intrusive investigations were undertaken. The site was also heavily constrained, limiting access for plant, equipment, and construction materials and requiring careful consideration of the temporary works methodology. Process LSY coordinated an initial programme of trial holes and intrusive investigations to establish the existing structural arrangement and determine the depth and configuration of the existing foundations. The investigations confirmed that the proposed excavation works would be undertaken in close proximity to the existing building foundations and that the temporary works system would need to accommodate significant building surcharge loads while maintaining excavation stability. Due to the restricted site access, we developed a temporary works solution using timber waling beams and sheeted excavation support systems. The lightweight nature of the materials allowed them to be transported and installed within the confined site environment while maintaining the required structural performance. For the internal alterations, several load-bearing walls were scheduled for removal as part of the refurbishment works. LSY designed a temporary support system comprising multi-props and steel needle beams, propped from the existing floor slab at three key locations. This arrangement provided a safe and efficient means of maintaining structural stability while permanent alterations were undertaken. The project also involved the removal of an existing steel beam weighing approximately six tonnes. Following consultation with the contractor, it was agreed that the beam would be dismantled in 1m sections to overcome site access restrictions and minimise lifting requirements. Detailed structural checks were undertaken to confirm that the remaining supporting structure could safely resist the temporary point loads generated during the phased removal process. This allowed the work to proceed safely without the need for additional extensive temporary support systems. Throughout the project, LSY worked closely with the contractor and wider design team, ensuring that temporary works designs were practical, buildable, and fully integrated with the construction programme. Outcome The excavation and refurbishment works were completed successfully and ahead of programme. The use of lightweight timber excavation support elements enabled the contractor to overcome challenging site access restrictions while maintaining safe working conditions throughout the construction phase. Similarly, the temporary needle beam and multi-prop support arrangements provided an efficient solution for the internal alterations, helping to reduce programme durations and minimise disruption to the wider project. The successful delivery of the scheme demonstrated the value of early temporary works involvement and close collaboration between the engineering and construction teams. As a result of the project's success, LSY Engineering Consultants Ltd was subsequently appointed by the main contractor on a number of additional projects to provide temporary works engineering services.

Sirinham Point, London, UK

LSY Engineering Consultants Ltd was appointed as lead Structural Engineer for a complex remediation project within an occupied eighteen-storey residential building. The project involved assessing the feasibility of removing an existing reinforced concrete shear wall at basement level to create access for the removal of contaminated water and oil storage tanks. Our involvement spanned the project lifecycle from initial feasibility and site investigations through to concept development, detailed design, and tender-stage support.