Temporary Works

LSY Engineering Consultants Ltd have undertaken a wide variety of temporary works schemes across various sectors including aviation, commercial, education, hotels, infrastructure, leisure, listed, nuclear, rail, residential and retail. The temporary works schemes we have worked on include Foley Street, Lanark Road, Holloway Road, AWE West End Construction Enclave 2, Bath University, Brighton Dome, EBR Heathrow, Hatton Cross Hotel, KAD Heathrow, King’s College Wimbledon, King’s College Battersea, Royal College of Music, Savill Court Hotel, Stowe School and the West London Islamic Centre.

The temporary work design solutions include:

  • Access platforms
  • Back propping
  • Canti decking
  • Category 2 checks
  • Crane bases
  • Crane pad certification
  • Excavation batter designs
  • Excavation shaft supports
  • Formwork design
  • Hoarding design
  • Needling beam systems
  • Piling platforms
  • Sheet piling
  • Shoring
  • Structural appraisal checks
  • Temporary cabin foundations
  • Thrust blocks
IMG 1596

Lanark Road, London, UK

Lanark Road is based in Maida Vale, London, UK and is a residential development of concrete frame construction including a basement. LSY Engineering Consultants Ltd carried out the design of sheet piles, formwork, access platforms and temporary excavation supports for crane base construction.

0108 More info
IMG 1207

Holloway Road, London, UK

Holloway Road is based in London, UK and is a residential development of concrete frame construction including basement construction. LSY Engineering Consultants Ltd carried out the design of sheet piles, underpinning, formwork and the temporary propping required for the boundary walls.

0093 More info
IMG 5422

Hatton Cross Hotel, Hatton Cross, London, UK

This Hotel involved the construction of a double basement and six storey RC Frame next to Hatton Cross Station. This was a challenging project logistically, as the hotel was under a flight path, and we were subject to heavy crane restrictions. LSY Engineering Consultants Ltd carried out the sheet pile designs, temporary batter designs for excavations and thrust block design.

0155 More info
IMG 5362

Kings College School, Southside, Wimbledon Common,UK

King's College School is a selective independent school in Wimbledon, London, UK. The project involved the construction of a new swimming pool. LSY Engineering Consultants Ltd carried out the design of sheet piles, formwork, access platforms and temporary excavation supports for the installation of a new pumping station.

0128 More info
IMG 1571

Royal College of Music, London, UK

The Royal College of Music is a conservatoire located in South Kensington, London, UK. The project was an RC frame extension to the existing building. LSY Engineering Consultants Ltd carried out the design of sheet piles, formwork, access platforms and temporary excavation supports for the installation of a new pumping station.

0131 More info
DSC03238

Savill Court Hotel, Wick Lane, Englefield Green, UK

This project was an £18 million state of the art 5-star hotel with a double story basement in the Royal Borough of Windsor. The basement, constructed completely below the ground water table, was in excess of 8000m². LSY Engineering Consultants Ltd undertook the temporary works designs including piling platform designs, crane base certification, sheet pile designs. thrust block designs, backpropping certification, scaffold base design and placing boom temporary backpropping certification.

0206 More info