• IMG 5362
  • IMG 5363
  • IMG 5364
  • IMG 5365
  • IMG 5366
  • IMG 5367
0128
Sector Temporary Works
Location Kings College School, Southside, Wimbledon Common, UK
Date 2018
Status Completed
Role Full temporary works designs
Details Swimming Pool Construction. Temporary excavation supports for the installation of a pump station. Formwork designs.

Kings College School, Southside, Wimbledon Common,UK

King's College School is a selective independent school in Wimbledon, London, UK. The project involved the construction of a new swimming pool. LSY Engineering Consultants Ltd carried out the design of sheet piles, formwork, access platforms and temporary excavation supports for the installation of a new pumping station.